IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
SIC 2066 Chocolate And Cocoa Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0101 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,700 $19,110 Not Implemented
DL0101 # 05 Y:2013 05 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,900 $3,500 Not Implemented
DL0101 # 04 Y:2013 04 2013 REPLACE BOILER $16,867 $28,062 Not Implemented
DL0101 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $51,000 $130,000 Not Implemented
DL0101 # 01 Y:2013 01 2013 CLOSE OFF UNNEEDED STEAM LINES $5,097 $225 Not Implemented
DL0101 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,100 $22,500 Not Implemented
DL0101 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,800 $0 Not Implemented
IC0191 # 06 Y:2011 06 2011 REPAIR AND ELIMINATE STEAM LEAKS $714 $200 n/a
IC0191 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,189 $690 n/a
IC0191 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $190 $150 n/a
IC0191 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $6,711 $2,345 n/a
IC0191 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,379 $0 n/a
IC0191 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,804 $57,885 n/a
IC0191 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,161 $109,685 n/a
IC0191 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $893 $0 n/a
SF0385 # 06 Y:2010 06 2010 USE PHOTOCELL CONTROLS $14,856 $6,800 Implemented
SF0385 # 15 Y:2010 15 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,355 $18,588 Not Implemented
SF0385 # 17 Y:2010 17 2010 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $57,997 $240,000 Not Implemented
SF0385 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,418 $0 Implemented
SF0385 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,350 $771 Not Implemented
SF0385 # 18 Y:2010 18 2010 USE OPTIMUM THICKNESS INSULATION $36,228 $325,369 Implemented
SF0385 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,270 $0 Implemented
SF0385 # 08 Y:2010 08 2010 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $187 $154 Not Implemented
SF0385 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,608 $750 Implemented
SF0385 # 16 Y:2010 16 2010 OPTIMIZE PLANT POWER FACTOR $9,677 $23,715 Implemented