IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

389

matching recommendations
Reset
SIC 207 Fats And Oils
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0147 # 10 Y:1996 10 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,500 $0 Implemented
SF0053 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,622 $1,540 Implemented
SF0053 # 02 Y:1995 02 1995 REPAIR AND ELIMINATE STEAM LEAKS $384 $150 Implemented
SF0053 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $834 $576 Implemented
SF0053 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $11,243 $19,840 Not Implemented
SF0053 # 05 Y:1995 05 1995 UPGRADE CONTROLS ON COMPRESSORS $18,222 $2,100 Implemented
SF0053 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,019 $28,800 Not Implemented
SF0053 # 07 Y:1995 07 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $243,737 $345,500 Not Implemented
SF0053 # 08 Y:1995 08 1995 OPTIMIZE PLANT POWER FACTOR $2,956 $4,084 Not Implemented
OR0225 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,420 $0 Not Implemented
OR0225 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,415 $10,402 Not Implemented
OR0225 # 03 Y:1994 03 1994 COMBINE UTILITY METERS $4,844 $2,863 Not Implemented
OR0225 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,649 $500 Implemented
OR0225 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $4,360 $13,200 Not Implemented
GT0543 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,750 $14,450 Not Implemented
GT0543 # 02 Y:1994 02 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $10,138 $3,400 Implemented
GT0543 # 03 Y:1994 03 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,530 $7,185 Not Implemented
GT0543 # 04 Y:1994 04 1994 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,880 $8,250 Implemented
GT0543 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,940 $5,000 Implemented
GT0543 # 06 Y:1994 06 1994 USE COMPRESSOR AIR FILTERS $815 $750 Implemented
OR0214 # 01 Y:1994 01 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $266 $0 Not Implemented
OR0214 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,849 $500 Implemented
OR0214 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $2,080 $4,800 Not Implemented
OR0214 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-128 $25 Not Implemented
AR0022 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,415 $5,110 Not Implemented