Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0211 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,276 | $31,550 | Implemented |
DL0211 # 06 Y:2022 | 06 | 2022 | RECOVER AND REUSE COOLING WATER | $52,650 | $50,000 | Implemented |
DL0211 # 08 Y:2022 | 08 | 2022 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $3,578 | $13,772 | Implemented |
DL0211 # 11 Y:2022 | 11 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,347 | $16,607 | Implemented |
DL0211 # 01 Y:2022 | 01 | 2022 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $4,080 | $450 | Implemented |
NC0413 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,796 | $50 | Implemented |
NC0413 # 04 Y:2010 | 04 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,066 | $1,000 | Implemented |
NC0413 # 03 Y:2010 | 03 | 2010 | INSULATE FEEDWATER TANK | $283 | $337 | Implemented |
NC0413 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,881 | $100 | Implemented |
NC0344 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,686 | $4,423 | Implemented |
NC0344 # 04 Y:2006 | 04 | 2006 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $62,722 | $50,000 | Implemented |
NC0344 # 02 Y:2006 | 02 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $460,800 | $118,971 | Implemented |
WV0342 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $26,961 | $1,000 | Implemented |
WV0342 # 07 Y:2006 | 07 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $41,893 | $112,000 | Implemented |
WV0342 # 05 Y:2006 | 05 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $76,391 | $42,250 | Implemented |
WV0342 # 04 Y:2006 | 04 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $87,693 | $208,500 | Implemented |
WV0342 # 03 Y:2006 | 03 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $103,142 | $100,000 | Implemented |
WV0342 # 02 Y:2006 | 02 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $124,707 | $188,500 | Implemented |
WV0342 # 01 Y:2006 | 01 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $151,419 | $4,500 | Implemented |
WV0342 # 09 Y:2006 | 09 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,439 | $2,700 | Implemented |
WV0342 # 10 Y:2006 | 10 | 2006 | USE SYNTHETIC LUBRICANT | $23,049 | $280 | Implemented |
WV0342 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $18,125 | $2,570 | Implemented |
WV0342 # 17 Y:2006 | 17 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,975 | $2,344 | Implemented |
WV0342 # 12 Y:2006 | 12 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,068 | $1,000 | Implemented |
WV0342 # 13 Y:2006 | 13 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $11,020 | $1,348 | Implemented |