Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2414 # 10 Y:2024 | 10 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,737 | $25,000 | Implemented |
UW2414 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $220 | Implemented |
UW2414 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,019 | $162,415 | Implemented |
UW2414 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,539 | $52,000 | Implemented |
UW2414 # 02 Y:2024 | 02 | 2024 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $16,683 | $96,069 | Implemented |
UW2414 # 09 Y:2024 | 09 | 2024 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $252,286 | $90,000 | Implemented |
UW2414 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $812 | $1,219 | Implemented |
UW2414 # 11 Y:2024 | 11 | 2024 | USE OTHER METHODS FOR NEUTRALIZATION | $13,133 | $58,000 | Implemented |
UW2414 # 04 Y:2024 | 04 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $92,758 | $115,000 | Implemented |
UW2414 # 05 Y:2024 | 05 | 2024 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $57,690 | $7,906 | Implemented |
UW2414 # 06 Y:2024 | 06 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $36,181 | $110,000 | Implemented |
UW2409 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $240,871 | $7,750 | Implemented |
UW2409 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $1,927 | $2,080 | Implemented |
UW2409 # 03 Y:2024 | 03 | 2024 | TREAT AND REUSE RINSE WATERS | $1,034,601 | $300,000 | Implemented |
UW2409 # 04 Y:2024 | 04 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $16,446 | $18,600 | Implemented |
UW2409 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $61,679 | $155,400 | Implemented |
UW2409 # 06 Y:2024 | 06 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $72,261 | $271,830 | Implemented |
UW2409 # 07 Y:2024 | 07 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $24,670 | $223,625 | Implemented |
OR0777 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,479 | $0 | Implemented |
OR0777 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,570 | $0 | Implemented |
OR0777 # 02 Y:2023 | 02 | 2023 | INSTALL COMMON HEADER ON COMPRESSORS | $2,832 | $6,989 | Implemented |
OR0631 # 01 Y:2014 | 01 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,360 | $250 | Implemented |
OR0631 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $800 | $417 | Implemented |
OR0631 # 03 Y:2014 | 03 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,567 | $1,634 | Implemented |
OR0629 # 01 Y:2014 | 01 | 2014 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $37,907 | $21,000 | Implemented |