IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

531

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0461 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,819 $80,476 Implemented
SF0461 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $231 $1,000 Not Implemented
SF0461 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $424 $2,004 Not Implemented
SF0461 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN WATER LINES AND VALVES $666 $50 Implemented
SF0450 # 01 Y:2014 01 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,757 $0 Implemented
SF0450 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,693 $650 Implemented
SF0450 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,874 $19,111 Not Implemented
SF0450 # 04 Y:2014 04 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,675 $77,383 Not Implemented
SF0450 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,062 $12,000 Not Implemented
SF0450 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $2,563 $11,811 Implemented
SD0481 # 01 Y:2014 01 2014 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $134,111 $80,720 Implemented
SD0481 # 02 Y:2014 02 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $36,872 $91,000 Implemented
SD0481 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,839 $1,000 Implemented
SD0481 # 04 Y:2014 04 2014 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $22,759 $25,200 Not Implemented
SD0481 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,116 $2,600 Implemented
SD0481 # 06 Y:2014 06 2014 MAINTAIN MACHINES TO REDUCE LEAKS $14,877 $5,000 Implemented
SD0481 # 07 Y:2014 07 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,167 $16,320 Implemented
SD0481 # 08 Y:2014 08 2014 REPAIR AND ELIMINATE STEAM LEAKS $2,220 $1,200 Implemented
SD0481 # 09 Y:2014 09 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,553 $2,325 Implemented
SD0471 # 01 Y:2013 01 2013 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $629,471 $234,900 Not Implemented
SD0471 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $277,284 $353,400 Not Implemented
SD0471 # 03 Y:2013 03 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $92,696 $131,400 Not Implemented
SD0471 # 04 Y:2013 04 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $79,351 $96,000 Not Implemented
SD0471 # 05 Y:2013 05 2013 UPGRADE OBSOLETE EQUIPMENT $34,337 $110,000 Not Implemented
SD0471 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,423 $100,248 Implemented