Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,173

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0770 # 02 Y:2023 02 2023 REDUCE SCRAP PRODUCTION $111,700 $282,420 Not Implemented
OR0770 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,249 $9,000 Implemented
OR0770 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Not Implemented
DL0223 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,906 $7,955 Not Implemented
DL0223 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $490,980 $10,000 Not Implemented
DL0223 # 04 Y:2023 04 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $994 $4,800 Implemented
DL0223 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,840 $2,800 Not Implemented
DL0223 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,437 $1,030 Implemented
DL0223 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $9,025 $0 Implemented
SF0598 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,843 $8,505 Implemented
SF0598 # 06 Y:2023 06 2023 USE OPTIMUM THICKNESS INSULATION $1,644 $7,257 Not Implemented
SF0598 # 05 Y:2023 05 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,883 $23,100 Implemented
SF0598 # 04 Y:2023 04 2023 INSTALL REPLACEMENT DOORS $14,412 $27,546 Not Implemented
SF0598 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,578 $9,707 Not Implemented
SF0598 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,805 $1,551 Implemented
SF0598 # 01 Y:2023 01 2023 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $10,131 $0 Implemented
DL0219 # 09 Y:2023 09 2023 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $51,679 $50,000 Not Implemented
DL0219 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,178 $10,128 Implemented
DL0219 # 07 Y:2023 07 2023 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $2,856 $16,145 Not Implemented
DL0219 # 06 Y:2023 06 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $11,196 $50,000 Implemented
DL0219 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,974 $10,600 Implemented
DL0219 # 04 Y:2023 04 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,827 $0 Implemented
DL0219 # 03 Y:2023 03 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $6,246 $4,000 Not Implemented
DL0219 # 02 Y:2023 02 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $922 $520 Not Implemented
DL0219 # 01 Y:2023 01 2023 AIR CONDITION ONLY SPACE NECESSARY $496 $0 Implemented