IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,349

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0309 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $5,128 $3,024 Not Implemented
SD0309 # 04 Y:2003 04 2003 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,120 $20,000 Not Implemented
SD0309 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,945 $4,000 Not Implemented
SD0309 # 06 Y:2003 06 2003 INSTALL SKYLIGHTS $4,178 $9,500 Not Implemented
SD0309 # 07 Y:2003 07 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,955 $2,263 Implemented
SD0309 # 08 Y:2003 08 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,000 $10,000 Implemented
SD0309 # 09 Y:2003 09 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,820 $14,000 Not Implemented
SD0309 # 10 Y:2003 10 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,200 $2,500 Implemented
UU0034 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $3,790 $2,000 Not Implemented
UU0034 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $2,627 $3,621 Not Implemented
UU0034 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,938 $1,000 Not Implemented
UU0034 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,560 $0 Not Implemented
UU0034 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,759 $800 Not Implemented
AS0331 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $4,752 $3,880 Not Implemented
AS0331 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $17,275 $26,928 Not Implemented
AS0331 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,966 $20 Implemented
AS0331 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $34,077 $400 Not Implemented
AS0331 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $498 $542 Implemented
AS0331 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $371 $63 Implemented
AS0331 # 07 Y:2002 07 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $398 $0 Not Implemented
AS0331 # 08 Y:2002 08 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $89,018 $19,710 Implemented
AS0331 # 09 Y:2002 09 2002 PAY BILLS ON TIME TO AVOID LATE FEES $819 $144 Implemented
UF0301 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $1,016 $0 Not Implemented
UF0301 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,352 $134 Not Implemented
UF0301 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $809 $0 Not Implemented