IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0414 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $807 $262 Not Implemented
IA0414 # 02 Y:2007 02 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $501 $118 Not Implemented
IA0414 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,590 $3,793 Not Implemented
IA0414 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $163 Not Implemented
IA0414 # 05 Y:2007 05 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $2,721 $1,300 Not Implemented
IA0339 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $50 Implemented
IA0339 # 06 Y:2004 06 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,825 $1,000 Implemented
IA0339 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,008 $540 Not Implemented
IA0339 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,524 $1,430 Implemented
IA0339 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,060 $3,135 Implemented
IA0339 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,295 $1,101 Implemented
IA0339 # 07 Y:2004 07 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,005 $75,600 Not Implemented
IA0182 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,806 $2,000 Implemented
IA0182 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,379 $3,424 Not Implemented
IA0182 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $159 $284 Implemented
IA0182 # 08 Y:1997 08 1997 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $8,237 $504 Not Implemented
IA0182 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $113 $106 Implemented
IA0182 # 04 Y:1997 04 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $278 $560 Not Implemented
IA0182 # 07 Y:1997 07 1997 $5,140 $5,880 Implemented
IA0182 # 06 Y:1997 06 1997 $68,246 $265,000 Not Implemented
DS0065 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $616 $11,156 Implemented
DS0065 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $2,545 $2,161 Not Implemented
DS0065 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $812 $225 Not Implemented
DS0065 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $3,067 $683 Implemented
DS0065 # 06 Y:1996 06 1996 RECOVER AND REUSE COOLING WATER $2,576 $4,603 Not Implemented