Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0228 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,227 | $350 | n/a |
DL0228 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,279 | $0 | n/a |
DL0228 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,322 | $37,499 | n/a |
DL0228 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,115 | $4,102 | n/a |
DL0228 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,512 | $73,200 | n/a |
DL0228 # 01 Y:2023 | 01 | 2023 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $4,024 | $700 | n/a |
DL0189 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,750 | $2,550 | Not Implemented |
DL0189 # 07 Y:2021 | 07 | 2021 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $24,980 | $15,000 | Not Implemented |
DL0189 # 06 Y:2021 | 06 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,820 | $24,000 | Implemented |
DL0189 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $5,300 | $425 | Implemented |
DL0189 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,110 | $72,258 | Implemented |
DL0189 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,940 | $20,000 | Implemented |
DL0189 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,300 | $3,250 | Not Implemented |
DL0147 # 03 Y:2015 | 03 | 2015 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $27,680 | $73,960 | Implemented |
DL0147 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,890 | $32,055 | Not Implemented |
DL0147 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,550 | $9,700 | Not Implemented |
DL0147 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,470 | $21,000 | Implemented |
LE0385 # 11 Y:2014 | 11 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,728 | $11,400 | Not Implemented |
LE0385 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,496 | $12,000 | Implemented |
LE0385 # 08 Y:2014 | 08 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,231 | $4,000 | Not Implemented |
LE0385 # 06 Y:2014 | 06 | 2014 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,266 | $13,200 | Not Implemented |
LE0385 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $7,685 | $12,000 | Implemented |
LE0385 # 04 Y:2014 | 04 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,746 | $11,000 | Implemented |
LE0385 # 03 Y:2014 | 03 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,210 | $3,040 | Not Implemented |
LE0385 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,455 | $1,000 | Implemented |