Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
106
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0137 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $640 | $1,040 | Not Implemented |
DL0137 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,820 | $10,075 | Not Implemented |
DL0137 # 01 Y:2014 | 01 | 2014 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,190 | $20,000 | Implemented |
DL0137 # 02 Y:2014 | 02 | 2014 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $14,240 | $5,460 | Not Implemented |
DL0137 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,900 | $38,400 | Not Implemented |
DL0137 # 04 Y:2014 | 04 | 2014 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $890 | $2,220 | Not Implemented |
DL0137 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,520 | $8,430 | Not Implemented |
DL0137 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $745 | $160 | Not Implemented |
DL0137 # 07 Y:2014 | 07 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,350 | $6,300 | Implemented |
DL0137 # 08 Y:2014 | 08 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $970 | $1,200 | Implemented |
DL0137 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $2,280 | Not Implemented |
LE0386 # 09 Y:2014 | 09 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $757 | $2,250 | Implemented |
LE0386 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,910 | $1,000 | Implemented |
LE0386 # 05 Y:2014 | 05 | 2014 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $451 | $232 | Not Implemented |
LE0386 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $43,975 | $10,000 | Implemented |
LE0386 # 08 Y:2014 | 08 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,813 | $20,000 | Not Implemented |
LE0386 # 02 Y:2014 | 02 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $61,300 | $2,592 | Implemented |
LE0386 # 06 Y:2014 | 06 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $12,502 | $16,700 | Implemented |
LE0386 # 07 Y:2014 | 07 | 2014 | REPLACE BOILER | $102,338 | $161,800 | Not Implemented |
LE0386 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $32 | Implemented |
LE0386 # 10 Y:2014 | 10 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,010 | $6,000 | Not Implemented |
OR0636 # 05 Y:2014 | 05 | 2014 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $712,265 | $3,300,000 | Not Implemented |
OR0636 # 01 Y:2014 | 01 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $31,057 | $7,123 | Not Implemented |
OR0636 # 03 Y:2014 | 03 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,708 | $7,000 | Implemented |
OR0636 # 04 Y:2014 | 04 | 2014 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $27,166 | $37,500 | Not Implemented |