Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
154
matching recommendationsSIC | 208 | Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0595 # 02 Y:2024 | 02 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $3,901 | $142 | n/a |
AS0595 # 03 Y:2024 | 03 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,366 | $166 | n/a |
AS0595 # 04 Y:2024 | 04 | 2024 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $420 | $72 | n/a |
AS0595 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $336 | $44 | n/a |
AS0595 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $255 | $197 | n/a |
AS0595 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $132 | $254 | n/a |
AS0595 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,614 | $149,397 | n/a |
UF0623 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $979 | $3,750 | n/a |
UF0623 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,616 | $0 | n/a |
UF0623 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $56,000 | $20,720 | n/a |
UF0623 # 07 Y:2024 | 07 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $958 | $1,400 | n/a |
UF0623 # 02 Y:2024 | 02 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,057 | $4,000 | n/a |
UF0623 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,088 | $3,402 | n/a |
UF0623 # 03 Y:2024 | 03 | 2024 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $4,089 | $5,440 | n/a |
UF0623 # 04 Y:2024 | 04 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $2,627 | $2,343 | n/a |
GT0986 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,252 | $1,850 | n/a |
GT0986 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $463,303 | $2,451,174 | n/a |
GT0986 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,353 | $800 | n/a |
GT0986 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,990 | $2,700 | n/a |
GT0986 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,037 | $800 | n/a |
SF0627 # 10 Y:2024 | 10 | 2024 | HEAT WATER WITH EXHAUST HEAT | $23,270 | $67,410 | n/a |
SF0627 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $772 | $338 | n/a |
SF0627 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $828 | $98 | n/a |
SF0627 # 12 Y:2024 | 12 | 2024 | INSTALL WIND POWERED ELECTRIC GENERATOR | $364,913 | $422,153 | n/a |
SF0627 # 11 Y:2024 | 11 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $758 | $3,995 | n/a |