Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 2082 | Malt Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0737 # 06 Y:2021 | 06 | 2021 | INSTALL OCCUPANCY SENSORS | $276 | $723 | Not Implemented |
CO0737 # 05 Y:2021 | 05 | 2021 | ELIMINATE/REDUCE AN OPERATION | $12,333 | $94,800 | Implemented |
CO0737 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,196 | $200 | Implemented |
CO0737 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,685 | $3,756 | Implemented |
CO0737 # 02 Y:2021 | 02 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,867 | $5,500 | Implemented |
CO0737 # 01 Y:2021 | 01 | 2021 | USE BATTERY STORAGE FOR DEMAND CONTROL | $10,391 | $42,800 | Implemented |
UU0147 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $433 | $400 | Implemented |
UU0147 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM THICKNESS INSULATION | $3,521 | $2,917 | Implemented |
UU0147 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,684 | $7,000 | Implemented |
UU0147 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,746 | $1,200 | Implemented |
UU0147 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,081 | $1,800 | Implemented |
UU0147 # 06 Y:2019 | 06 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $130 | $0 | Implemented |
UU0147 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $54,000 | $300,000 | Not Implemented |
UU0146 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,035 | $350 | Not Implemented |
UU0146 # 07 Y:2019 | 07 | 2019 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $367 | $1,200 | Not Implemented |
UU0146 # 03 Y:2019 | 03 | 2019 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,780 | $0 | Implemented |
UU0146 # 06 Y:2019 | 06 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $693 | $2,575 | Not Implemented |
UU0146 # 08 Y:2019 | 08 | 2019 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $231 | $1,100 | Not Implemented |
UU0146 # 09 Y:2019 | 09 | 2019 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $97 | $75 | Implemented |
UU0146 # 10 Y:2019 | 10 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,482 | $1,000 | Not Implemented |
UU0146 # 02 Y:2019 | 02 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,186 | $2,000 | Not Implemented |
UU0146 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $37,500 | $225,000 | Not Implemented |
UU0146 # 05 Y:2019 | 05 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $850 | $0 | Not Implemented |
CO0688 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,490 | $10,380 | Not Implemented |
CO0688 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,390 | $1,500 | Implemented |