IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

596

matching recommendations
Reset
SIC 2082 Malt Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0146 # 07 Y:2019 07 2019 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $367 $1,200 Not Implemented
UU0146 # 08 Y:2019 08 2019 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $231 $1,100 Not Implemented
UU0146 # 09 Y:2019 09 2019 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $97 $75 Implemented
UU0146 # 10 Y:2019 10 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,482 $1,000 Not Implemented
LS1815 # 01 Y:2018 01 2018 PAY UTILITY BILLS ON TIME $459 $25 Implemented
LS1815 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,369 $350 Implemented
LS1815 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $73 $25 Implemented
LS1815 # 04 Y:2018 04 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $146 $125 Implemented
LS1815 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15 $100 Implemented
LS1815 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,427 $3,000 Implemented
LS1815 # 07 Y:2018 07 2018 USE PHOTOCELL CONTROLS $88 $225 Not Implemented
LS1815 # 08 Y:2018 08 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $261 $788 Not Implemented
LS1810 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $358 $25 Not Implemented
LS1810 # 02 Y:2018 02 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $880 $340 Implemented
LS1810 # 03 Y:2018 03 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $650 $650 Not Implemented
LS1810 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $986 $1,088 Implemented
LS1810 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $37 $55 Not Implemented
LS1810 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $764 $1,800 Implemented
UD0983 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $390 $50 Not Implemented
UD0983 # 02 Y:2018 02 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $13,719 $2,500 Not Implemented
UD0983 # 03 Y:2018 03 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,019 $4,500 Not Implemented
UD0983 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,393 $6,000 Not Implemented
UD0983 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,115 $0 Implemented
UD0983 # 06 Y:2018 06 2018 USE OPTIMUM TEMPERATURE $836 $0 Not Implemented
UD0983 # 07 Y:2018 07 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $819 $1,100 Implemented