Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 2082 | Malt Beverages |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0137 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $640 | $1,040 | Not Implemented |
DL0137 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,820 | $10,075 | Not Implemented |
DL0137 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $245 | $2,280 | Not Implemented |
DL0137 # 08 Y:2014 | 08 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $970 | $1,200 | Implemented |
DL0137 # 01 Y:2014 | 01 | 2014 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,190 | $20,000 | Implemented |
DL0137 # 02 Y:2014 | 02 | 2014 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $14,240 | $5,460 | Not Implemented |
DL0137 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,900 | $38,400 | Not Implemented |
DL0137 # 04 Y:2014 | 04 | 2014 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $890 | $2,220 | Not Implemented |
DL0137 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,520 | $8,430 | Not Implemented |
DL0137 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $745 | $160 | Not Implemented |
DL0137 # 07 Y:2014 | 07 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,350 | $6,300 | Implemented |
OR0636 # 01 Y:2014 | 01 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $31,057 | $7,123 | Not Implemented |
OR0636 # 02 Y:2014 | 02 | 2014 | UPGRADE OBSOLETE EQUIPMENT | $55,473 | $50,000 | Not Implemented |
OR0636 # 03 Y:2014 | 03 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $5,708 | $7,000 | Implemented |
OR0636 # 04 Y:2014 | 04 | 2014 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $27,166 | $37,500 | Not Implemented |
OR0636 # 05 Y:2014 | 05 | 2014 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $712,265 | $3,300,000 | Not Implemented |
LE0385 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,165 | $40 | Not Implemented |
LE0385 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,455 | $1,000 | Implemented |
LE0385 # 03 Y:2014 | 03 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,210 | $3,040 | Not Implemented |
LE0385 # 04 Y:2014 | 04 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,746 | $11,000 | Implemented |
LE0385 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $7,685 | $12,000 | Implemented |
LE0385 # 06 Y:2014 | 06 | 2014 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,266 | $13,200 | Not Implemented |
LE0385 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,022 | $1,700 | Implemented |
LE0385 # 08 Y:2014 | 08 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,231 | $4,000 | Not Implemented |
LE0385 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,496 | $12,000 | Implemented |