Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 2083 | Malt |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0777 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,570 | $0 | Implemented |
OR0777 # 02 Y:2023 | 02 | 2023 | INSTALL COMMON HEADER ON COMPRESSORS | $2,832 | $6,989 | Implemented |
OR0777 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,479 | $0 | Implemented |
OR0629 # 04 Y:2014 | 04 | 2014 | REPLACE BOILER | $523,306 | $3,403,664 | Implemented |
OR0629 # 03 Y:2014 | 03 | 2014 | RECOVER AND REUSE COOLING WATER | $58,681 | $3,764 | Implemented |
OR0629 # 02 Y:2014 | 02 | 2014 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $37,863 | $38,930 | Not Implemented |
OR0629 # 01 Y:2014 | 01 | 2014 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $37,907 | $21,000 | Implemented |
OR0494 # 09 Y:2005 | 09 | 2005 | REDUCE FLUID FLOW RATES | $2,400 | $0 | Implemented |
OR0494 # 15 Y:2005 | 15 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,580 | $19,700 | Not Implemented |
OR0494 # 14 Y:2005 | 14 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $107,700 | $340,000 | Implemented |
OR0494 # 13 Y:2005 | 13 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,800 | $49,400 | Implemented |
OR0494 # 12 Y:2005 | 12 | 2005 | UPGRADE OBSOLETE EQUIPMENT | $1,100 | $1,300 | Not Implemented |
OR0494 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,400 | $6,500 | Implemented |
OR0494 # 10 Y:2005 | 10 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $3,500 | $2,320 | Not Implemented |
OR0494 # 08 Y:2005 | 08 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,100 | $0 | Implemented |
OR0494 # 07 Y:2005 | 07 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,400 | $0 | Implemented |
OR0494 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,100 | $0 | Implemented |
OR0494 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $55,000 | $3,100 | Implemented |
OR0494 # 04 Y:2005 | 04 | 2005 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $36,800 | $1,400 | Not Implemented |
OR0494 # 03 Y:2005 | 03 | 2005 | REDUCE FLUID FLOW RATES | $54,700 | $630 | Implemented |
OR0494 # 02 Y:2005 | 02 | 2005 | REDUCE FLUID FLOW RATES | $63,500 | $0 | Implemented |
OR0494 # 01 Y:2005 | 01 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,000 | $0 | Not Implemented |
OR0125 # 01 Y:1991 | 01 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $18,739 | $0 | Implemented |
OR0125 # 05 Y:1991 | 05 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,934 | $83,040 | Implemented |
OR0125 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,743 | $0 | Implemented |