Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsSIC | 2085 | Distilled And Blended Liquors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0294 # 01 Y:2002 | 01 | 2002 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,512 | $6,000 | Not Implemented |
SD0294 # 02 Y:2002 | 02 | 2002 | ISOLATE HOT OR COLD EQUIPMENT | $3,123 | $5,200 | Not Implemented |
SD0294 # 03 Y:2002 | 03 | 2002 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,969 | $2,000 | Not Implemented |
SD0294 # 05 Y:2002 | 05 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,904 | $2,000 | Implemented |
SD0294 # 04 Y:2002 | 04 | 2002 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $501 | $20 | Not Implemented |
UL0233 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,210 | $50 | Implemented |
UL0233 # 05 Y:1999 | 05 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $7,011 | $9,500 | Implemented |
UL0233 # 04 Y:1999 | 04 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,027 | $4,475 | Implemented |
UL0233 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $10,120 | $0 | Not Implemented |
UL0233 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,678 | $261 | Not Implemented |
UL0233 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $594 | $0 | Not Implemented |
UD0553 # 02 Y:1998 | 02 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,410 | $12,100 | Not Implemented |
UD0553 # 03 Y:1998 | 03 | 1998 | USE PLASTIC PALLETS INSTEAD OF WOOD | $5,600 | $0 | Not Implemented |
UD0553 # 04 Y:1998 | 04 | 1998 | INSTALL COMMON HEADER ON COMPRESSORS | $12,000 | $2,000 | Not Implemented |
UD0553 # 01 Y:1998 | 01 | 1998 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $21,875 | $500 | Not Implemented |
UD0553 # 05 Y:1998 | 05 | 1998 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $11,947 | $10,000 | Not Implemented |
UD0553 # 06 Y:1998 | 06 | 1998 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $8,274 | $1,000 | Not Implemented |
UD0553 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,594 | $13,677 | Not Implemented |
UD0553 # 08 Y:1998 | 08 | 1998 | UPGRADE CONTROLS ON COMPRESSORS | $5,271 | $800 | Implemented |
DS0065 # 07 Y:1996 | 07 | 1996 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $60,801 | $21,060 | Not Implemented |
DS0065 # 06 Y:1996 | 06 | 1996 | RECOVER AND REUSE COOLING WATER | $2,576 | $4,603 | Not Implemented |
DS0065 # 05 Y:1996 | 05 | 1996 | INSULATE BARE EQUIPMENT | $3,067 | $683 | Implemented |
DS0065 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $812 | $225 | Not Implemented |
DS0065 # 03 Y:1996 | 03 | 1996 | OPTIMIZE PLANT POWER FACTOR | $2,545 | $2,161 | Not Implemented |
DS0065 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,358 | $9,190 | Implemented |