IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

811

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0623 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,089 $5,440 Implemented
UF0623 # 02 Y:2024 02 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,057 $4,000 Implemented
UF0623 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,088 $3,402 Implemented
UF0623 # 08 Y:2024 08 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $56,000 $20,720 Implemented
UF0623 # 04 Y:2024 04 2024 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $2,627 $2,343 Implemented
UF0623 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $958 $1,400 Implemented
UF0623 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,616 $0 Implemented
NT0030 # 07 Y:2024 07 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,747 $1,279 Implemented
NT0030 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $27,850 $0 Implemented
TT0318 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,027 $65,640 Implemented
TT0318 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,101 $94 Implemented
TT0318 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $25,497 $30,000 Implemented
UW2409 # 03 Y:2024 03 2024 TREAT AND REUSE RINSE WATERS $1,034,601 $300,000 Implemented
UW2409 # 04 Y:2024 04 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $16,446 $18,600 Implemented
UW2409 # 07 Y:2024 07 2024 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $24,670 $223,625 Implemented
UW2409 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $1,927 $2,080 Implemented
UW2409 # 01 Y:2024 01 2024 REPAIR OR REPLACE STEAM TRAPS $240,871 $7,750 Implemented
UW2409 # 05 Y:2024 05 2024 REPLACE BOILER $61,679 $155,400 Implemented
UW2409 # 06 Y:2024 06 2024 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $72,261 $271,830 Implemented
OR0786 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $7,048 $108,930 Implemented
OR0786 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,522 $2,500 Implemented
OR0786 # 03 Y:2024 03 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,567 $726 Implemented
OR0786 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,491 $0 Implemented
CM1029 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,117 $8,000 Implemented
CM1029 # 04 Y:2023 04 2023 REPLACE BOILER $8,337 $38,130 Implemented