Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
782
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0229 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM TEMPERATURE | $2,146 | $3,060 | Implemented |
UU0229 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,527 | $5,600 | Implemented |
UU0229 # 03 Y:2023 | 03 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $4,945 | $3,480 | Implemented |
DL0223 # 04 Y:2023 | 04 | 2023 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $994 | $4,800 | Implemented |
DL0223 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,437 | $1,030 | Implemented |
DL0223 # 01 Y:2023 | 01 | 2023 | ELIMINATE/REDUCE AN OPERATION | $9,025 | $0 | Implemented |
DL0219 # 01 Y:2023 | 01 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $496 | $0 | Implemented |
DL0219 # 04 Y:2023 | 04 | 2023 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,827 | $0 | Implemented |
DL0219 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,178 | $10,128 | Implemented |
DL0219 # 06 Y:2023 | 06 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $11,196 | $50,000 | Implemented |
DL0219 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,974 | $10,600 | Implemented |
MI0411 # 06 Y:2022 | 06 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,028 | $0 | Implemented |
MI0411 # 02 Y:2022 | 02 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,400 | $630 | Implemented |
MI0411 # 07 Y:2022 | 07 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,063 | $27,147 | Implemented |
MI0411 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,210 | $1,650 | Implemented |
DL0211 # 11 Y:2022 | 11 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,347 | $16,607 | Implemented |
DL0211 # 06 Y:2022 | 06 | 2022 | RECOVER AND REUSE COOLING WATER | $52,650 | $50,000 | Implemented |
DL0211 # 01 Y:2022 | 01 | 2022 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $4,080 | $450 | Implemented |
DL0211 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,276 | $31,550 | Implemented |
DL0211 # 08 Y:2022 | 08 | 2022 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $3,578 | $13,772 | Implemented |
OK1072 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,650 | $0 | Implemented |
AM0847 # 08 Y:2022 | 08 | 2022 | USE PHOTOCELL CONTROLS | $330 | $110 | Implemented |
AM0847 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,420 | $2,240 | Implemented |
AM0847 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $840 | $10 | Implemented |
AM0847 # 06 Y:2022 | 06 | 2022 | USE SYNTHETIC LUBRICANT | $506 | $220 | Implemented |