Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
788
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0346 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $390 | $200 | Implemented |
AM0346 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $410 | $250 | Implemented |
AM0346 # 06 Y:1999 | 06 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $180 | $140 | Implemented |
ND0317 # 03 Y:1999 | 03 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $273 | $60 | Implemented |
ND0317 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,479 | $7,733 | Implemented |
ND0317 # 06 Y:1999 | 06 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,285 | $260 | Implemented |
ND0317 # 08 Y:1999 | 08 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $146 | $70 | Implemented |
NV0121 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,107 | $12,275 | Implemented |
NV0121 # 04 Y:1999 | 04 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,198 | $0 | Implemented |
MA0422 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $764 | $0 | Implemented |
MA0422 # 04 Y:1998 | 04 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $452 | $1,270 | Implemented |
MA0422 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $337 | $346 | Implemented |
MA0422 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $236 | $776 | Implemented |
WI0332 # 01 Y:1998 | 01 | 1998 | INSTALL AUTOMATIC PACKING EQUIPMENT | $72,000 | $150,000 | Implemented |
WI0332 # 02 Y:1998 | 02 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $16,089 | $500 | Implemented |
ND0311 # 04 Y:1998 | 04 | 1998 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $704 | $2,300 | Implemented |
ND0311 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $414 | $450 | Implemented |
KU0493 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM TEMPERATURE | $28,340 | $3,500 | Implemented |
KU0493 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,340 | $9,530 | Implemented |
KU0493 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,290 | $4,940 | Implemented |
KU0493 # 05 Y:1998 | 05 | 1998 | ISOLATE HOT OR COLD EQUIPMENT | $1,310 | $1,000 | Implemented |
KU0493 # 07 Y:1998 | 07 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $600 | $1,000 | Implemented |
KU0493 # 08 Y:1998 | 08 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $540 | Implemented |
KU0493 # 11 Y:1998 | 11 | 1998 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $580 | $1,050 | Implemented |
AM0314 # 01 Y:1998 | 01 | 1998 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $12,090 | $0 | Implemented |