IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

788

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0346 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $390 $200 Implemented
AM0346 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $410 $250 Implemented
AM0346 # 06 Y:1999 06 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $180 $140 Implemented
ND0317 # 03 Y:1999 03 1999 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $273 $60 Implemented
ND0317 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,479 $7,733 Implemented
ND0317 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,285 $260 Implemented
ND0317 # 08 Y:1999 08 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $146 $70 Implemented
NV0121 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,107 $12,275 Implemented
NV0121 # 04 Y:1999 04 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,198 $0 Implemented
MA0422 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $764 $0 Implemented
MA0422 # 04 Y:1998 04 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $452 $1,270 Implemented
MA0422 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $337 $346 Implemented
MA0422 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $776 Implemented
WI0332 # 01 Y:1998 01 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $72,000 $150,000 Implemented
WI0332 # 02 Y:1998 02 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $16,089 $500 Implemented
ND0311 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $704 $2,300 Implemented
ND0311 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $414 $450 Implemented
KU0493 # 01 Y:1998 01 1998 USE OPTIMUM TEMPERATURE $28,340 $3,500 Implemented
KU0493 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,340 $9,530 Implemented
KU0493 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,290 $4,940 Implemented
KU0493 # 05 Y:1998 05 1998 ISOLATE HOT OR COLD EQUIPMENT $1,310 $1,000 Implemented
KU0493 # 07 Y:1998 07 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $600 $1,000 Implemented
KU0493 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $540 Implemented
KU0493 # 11 Y:1998 11 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $580 $1,050 Implemented
AM0314 # 01 Y:1998 01 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $12,090 $0 Implemented