Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0053 # 08 Y:2010 | 08 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,601 | $0 | Implemented |
MZ0053 # 07 Y:2010 | 07 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,342 | $1,160 | Implemented |
MZ0053 # 06 Y:2010 | 06 | 2010 | TURN OFF EQUIPMENT WHEN NOT IN USE | $987 | $0 | Implemented |
MZ0053 # 05 Y:2010 | 05 | 2010 | INSTALL OCCUPANCY SENSORS | $888 | $1,550 | Implemented |
MZ0053 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,022 | $33,660 | Implemented |
MZ0053 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,455 | $10,000 | Implemented |
MZ0053 # 02 Y:2010 | 02 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $959 | $1,000 | Implemented |
MZ0053 # 01 Y:2010 | 01 | 2010 | REPLACE BOILER | $33,880 | $115,000 | Implemented |
MZ0053 # 09 Y:2010 | 09 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,207 | $0 | Implemented |
MZ0053 # 10 Y:2010 | 10 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,916 | $1,100 | Implemented |
MZ0053 # 11 Y:2010 | 11 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,987 | $5,000 | Implemented |
BD0316 # 03 Y:2006 | 03 | 2006 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $13,153 | $8,363 | Implemented |
BD0316 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $679 | $2,102 | Implemented |
BD0316 # 04 Y:2006 | 04 | 2006 | INSTALL OCCUPANCY SENSORS | $1,033 | $675 | Implemented |
BD0316 # 02 Y:2006 | 02 | 2006 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $4,724 | $1,200 | Implemented |
KU0493 # 11 Y:1998 | 11 | 1998 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $580 | $1,050 | Implemented |
KU0493 # 08 Y:1998 | 08 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $540 | Implemented |
KU0493 # 07 Y:1998 | 07 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $600 | $1,000 | Implemented |
KU0493 # 05 Y:1998 | 05 | 1998 | ISOLATE HOT OR COLD EQUIPMENT | $1,310 | $1,000 | Implemented |
KU0493 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,290 | $4,940 | Implemented |
KU0493 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,340 | $9,530 | Implemented |
KU0493 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM TEMPERATURE | $28,340 | $3,500 | Implemented |
MO0198 # 02 Y:1997 | 02 | 1997 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $7,440 | $4,500 | Implemented |
MO0198 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,990 | $5,544 | Implemented |
MO0198 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,061 | $1,790 | Implemented |