Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0514 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,950 | $3,040 | Not Implemented |
KU0514 # 02 Y:1999 | 02 | 1999 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,760 | $13,490 | Not Implemented |
KU0514 # 01 Y:1999 | 01 | 1999 | USE OPTIMUM TEMPERATURE | $25,150 | $9,360 | Implemented |
KU0178 # 07 Y:1985 | 07 | 1985 | INSULATE BARE EQUIPMENT | $2,651 | $1,952 | Implemented |
KU0178 # 01 Y:1985 | 01 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $14,225 | $10 | Implemented |
KU0178 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,915 | $3,542 | Implemented |
KU0178 # 03 Y:1985 | 03 | 1985 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,185 | $300 | Implemented |
KU0178 # 04 Y:1985 | 04 | 1985 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $711 | $500 | Not Implemented |
KU0178 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,705 | $0 | Not Implemented |
KU0178 # 06 Y:1985 | 06 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,397 | $2,000 | Implemented |
KU0178 # 08 Y:1985 | 08 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,912 | $0 | Not Implemented |
KU0178 # 09 Y:1985 | 09 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $2,256 | $1,600 | Not Implemented |
KU0178 # 10 Y:1985 | 10 | 1985 | INSULATE BARE EQUIPMENT | $698 | $1,500 | Not Implemented |
KU0178 # 11 Y:1985 | 11 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $423 | $50 | Implemented |
KU0178 # 12 Y:1985 | 12 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $423 | $215 | Not Implemented |
KU0178 # 13 Y:1985 | 13 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $360 | $120 | Implemented |
KU0178 # 14 Y:1985 | 14 | 1985 | IMPROVE LUBRICATION PRACTICES | $466 | $250 | Not Implemented |
KU0178 # 15 Y:1985 | 15 | 1985 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $498 | $200 | Implemented |
KU0178 # 16 Y:1985 | 16 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $446 | $0 | Implemented |
KU0178 # 17 Y:1985 | 17 | 1985 | INSULATE BARE EQUIPMENT | $192 | $75 | Not Implemented |
KU0039 # 01 Y:1982 | 01 | 1982 | REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS | $26,510 | $35,000 | Not Implemented |
KU0039 # 07 Y:1982 | 07 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $6,940 | $100 | Not Implemented |
KU0039 # 06 Y:1982 | 06 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,569 | $25,000 | Not Implemented |
KU0039 # 05 Y:1982 | 05 | 1982 | INCREASE EFFICIENCY OF TRUCKS | $9,000 | $0 | Not Implemented |
KU0039 # 04 Y:1982 | 04 | 1982 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,511 | $3,000 | Not Implemented |