Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,749
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0342 # 03 Y:2006 | 03 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $103,142 | $100,000 | Implemented |
WV0342 # 04 Y:2006 | 04 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $87,693 | $208,500 | Implemented |
WV0342 # 05 Y:2006 | 05 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $76,391 | $42,250 | Implemented |
WV0342 # 06 Y:2006 | 06 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $74,909 | $77,050 | Not Implemented |
WV0342 # 07 Y:2006 | 07 | 2006 | OPERATE BOILERS ON HIGH FIRE SETTING | $41,893 | $112,000 | Implemented |
WV0342 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $26,961 | $1,000 | Implemented |
WV0342 # 09 Y:2006 | 09 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,439 | $2,700 | Implemented |
WV0342 # 10 Y:2006 | 10 | 2006 | USE SYNTHETIC LUBRICANT | $23,049 | $280 | Implemented |
WV0342 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $18,125 | $2,570 | Implemented |
WV0342 # 12 Y:2006 | 12 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $15,068 | $1,000 | Implemented |
WV0342 # 13 Y:2006 | 13 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $11,020 | $1,348 | Implemented |
WV0342 # 14 Y:2006 | 14 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,759 | $35 | Implemented |
WV0342 # 15 Y:2006 | 15 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,938 | $0 | Not Implemented |
WV0342 # 16 Y:2006 | 16 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,240 | $93 | Not Implemented |
WV0342 # 17 Y:2006 | 17 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,975 | $2,344 | Implemented |
AM0508 # 01 Y:2006 | 01 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $8,400 | $2,190 | Not Implemented |
AM0508 # 02 Y:2006 | 02 | 2006 | MODIFY STARTUP/SHUTDOWN TIMES | $7,024 | $0 | Not Implemented |
AM0508 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,950 | $500 | Not Implemented |
AM0508 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,700 | $270 | Not Implemented |
AM0508 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $295 | $140 | Not Implemented |
AM0508 # 06 Y:2006 | 06 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $210 | $50 | Not Implemented |
AM0508 # 07 Y:2006 | 07 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $190 | $0 | Not Implemented |
AM0508 # 08 Y:2006 | 08 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,980 | $500 | Not Implemented |
UU0098 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,060 | $0 | Implemented |
UU0098 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,360 | $2,100 | Implemented |