IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,749

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0575 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $68,834 $23,508 Implemented
MA0575 # 02 Y:2005 02 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,800 $41,620 Implemented
MA0575 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $18,805 $517 Implemented
MA0575 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,944 $7,285 Implemented
MA0575 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $0 Not Implemented
MA0575 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $512 $195 Not Implemented
MA0575 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $233 $30 Not Implemented
MI0103 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $61,700 $195,000 Not Implemented
MI0103 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,798 $906 Not Implemented
MI0103 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,613 $6,960 Not Implemented
MI0103 # 04 Y:2005 04 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,062 $1,536 Not Implemented
MI0103 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,001 $288 Not Implemented
MI0103 # 06 Y:2005 06 2005 INSTALL TIMERS AND/OR THERMOSTATS $556 $486 Not Implemented
AM0482 # 01 Y:2005 01 2005 TREAT AND REUSE RINSE WATERS $50,000 $2,000 Implemented
AM0482 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,940 $500 Implemented
AM0482 # 03 Y:2005 03 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,210 $0 Implemented
AM0482 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $1,020 $0 Implemented
AM0482 # 05 Y:2005 05 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $640 $0 Implemented
AM0482 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $280 $50 Not Implemented
AM0482 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $605 $350 Implemented
SU0205 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,784 $0 Implemented
SU0205 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,184 $0 Not Implemented
SU0205 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,803 $75 Implemented
SU0205 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,271 $560 Not Implemented
SU0205 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $5,926 $1,000 Implemented