IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0129 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,882 $3,000 Implemented
TT0129 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,827 $3,000 Not Implemented
TT0129 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,620 $2,025 Not Implemented
TT0129 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $107,559 $235,000 Not Implemented
TN0456 # 06 Y:1992 06 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $786 $700 Not Implemented
TN0456 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $787 $420 Not Implemented
TN0456 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,806 $470 Not Implemented
TN0456 # 03 Y:1992 03 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $610 $45 Not Implemented
TN0456 # 02 Y:1992 02 1992 IMPROVE LUBRICATION PRACTICES $2,396 $0 Not Implemented
TN0456 # 01 Y:1992 01 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,838 $3,300 Not Implemented
TN0338 # 07 Y:1988 07 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $518 $710 Not Implemented
TN0338 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,523 $0 Not Implemented
TN0338 # 05 Y:1988 05 1988 IMPROVE LUBRICATION PRACTICES $2,472 $3,600 Not Implemented
TN0338 # 04 Y:1988 04 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,373 $4,250 Not Implemented
TN0338 # 03 Y:1988 03 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,173 $375 Not Implemented
TN0338 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,878 $2,140 Not Implemented
TN0338 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $10,835 $42,500 Not Implemented
TN0322 # 03 Y:1987 03 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,634 $12,750 Implemented
TN0322 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $806 $1,500 Implemented
TN0322 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $9,054 $6,400 Implemented
TN0322 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,269 $1,125 Implemented
TN0322 # 07 Y:1987 07 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $638 $735 Implemented
TN0322 # 04 Y:1987 04 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,952 $0 Not Implemented
TN0322 # 06 Y:1987 06 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $40 Implemented
TN0266 # 07 Y:1985 07 1985 INSULATE BARE EQUIPMENT $294 $350 Not Implemented