Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1028 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,729 | $1,500 | Not Implemented |
OK1028 # 02 Y:2020 | 02 | 2020 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,193 | $3,750 | Not Implemented |
OK1028 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,990 | $3,313 | Not Implemented |
OK1028 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $53 | $111 | Not Implemented |
OK1028 # 05 Y:2020 | 05 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,802 | $8,260 | Not Implemented |
OK1028 # 06 Y:2020 | 06 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $258 | $616 | Not Implemented |
UF0550 # 05 Y:2020 | 05 | 2020 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $383,788 | $897,972 | Implemented |
UF0550 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $41,888 | $29,990 | Implemented |
UF0550 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,802 | $30,000 | Implemented |
UF0550 # 03 Y:2020 | 03 | 2020 | INSTALL TURBULATORS | $3,921 | $11,250 | Implemented |
UF0550 # 04 Y:2020 | 04 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,928 | $2,800 | Implemented |
UA0221 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,863 | $4,000 | Implemented |
UA0221 # 03 Y:2020 | 03 | 2020 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,121 | $0 | Implemented |
UA0221 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,795 | $50 | Not Implemented |
UA0221 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,796 | $7,800 | Implemented |
UA0221 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,898 | $8,350 | Not Implemented |
AM0797 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,400 | $2,000 | Implemented |
AM0797 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $17,410 | $34,210 | Implemented |
AM0797 # 03 Y:2020 | 03 | 2020 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $9,500 | $20,000 | Implemented |
AM0797 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,799 | $400 | Implemented |
AM0797 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $5,725 | $420 | Implemented |
AM0797 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,280 | $22,200 | Implemented |
AM0797 # 07 Y:2020 | 07 | 2020 | USE SYNTHETIC LUBRICANT | $5,500 | $200 | Implemented |
AM0797 # 08 Y:2020 | 08 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $860 | $60 | Implemented |
AM0797 # 09 Y:2020 | 09 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $725 | $730 | Implemented |