Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CM1029 # 06 Y:2023 | 06 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,800 | $0 | Implemented |
CM1029 # 05 Y:2023 | 05 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $76,117 | $8,000 | Implemented |
CM1029 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $8,337 | $38,130 | Implemented |
CM1029 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,259 | $23,838 | Not Implemented |
CM1029 # 02 Y:2023 | 02 | 2023 | INCREASE EFFICIENCY OF TRUCKS | $113,963 | $779,750 | Not Implemented |
CM1029 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,556 | $3,717 | Not Implemented |
AS0567 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $86,125 | $165,996 | Not Implemented |
AS0567 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,430 | $774,239 | Implemented |
AS0567 # 05 Y:2023 | 05 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $647 | $384 | Not Implemented |
AS0567 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,255 | $31,926 | Not Implemented |
AS0567 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $57,803 | $10,720 | Not Implemented |
DL0228 # 01 Y:2023 | 01 | 2023 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $4,024 | $700 | Implemented |
DL0228 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,512 | $73,200 | Not Implemented |
DL0228 # 04 Y:2023 | 04 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,115 | $4,102 | Not Implemented |
DL0228 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,322 | $37,499 | Not Implemented |
DL0228 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,227 | $350 | Not Implemented |
DL0228 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,279 | $0 | Implemented |
UU0229 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM TEMPERATURE | $2,146 | $3,060 | Implemented |
UU0229 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,527 | $5,600 | Implemented |
UU0229 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,440 | $3,816 | Not Implemented |
UU0229 # 03 Y:2023 | 03 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $4,945 | $3,480 | Implemented |
DL0223 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,437 | $1,030 | Implemented |
DL0223 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,840 | $2,800 | Not Implemented |
DL0223 # 04 Y:2023 | 04 | 2023 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $994 | $4,800 | Implemented |
DL0223 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $490,980 | $10,000 | Not Implemented |