IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 2087 Flavoring Extracts And Syrups, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0952 # 13 Y:2016 13 2016 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $17,619 $90,000 Not Implemented
UD0952 # 01 Y:2016 01 2016 COMBINE UTILITY METERS $26,792 $0 Implemented
UD0952 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,722 $0 Implemented
UD0952 # 03 Y:2016 03 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,277 $0 Not Implemented
UD0952 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,157 $0 Not Implemented
UD0952 # 05 Y:2016 05 2016 INSULATE FEEDWATER TANK $983 $509 Not Implemented
UD0952 # 06 Y:2016 06 2016 INSTALL TURBULATORS $6,373 $3,750 Not Implemented
UD0952 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,764 $1,000 Implemented
UD0952 # 08 Y:2016 08 2016 UPGRADE CONTROLS ON COMPRESSORS $1,652 $800 Implemented
UD0952 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $10,838 $19,760 Not Implemented
UD0952 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,795 $12,240 Implemented
UD0952 # 11 Y:2016 11 2016 DISCONNECT BALLASTS $546 $80 Not Implemented
UD0952 # 12 Y:2016 12 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $9,559 $23,200 Not Implemented
UD0874 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,535 $0 Implemented
UD0874 # 11 Y:2013 11 2013 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $317,641 $906,381 Not Implemented
UD0874 # 10 Y:2013 10 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,382 $30,000 Not Implemented
UD0874 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,928 $12,300 Not Implemented
UD0874 # 08 Y:2013 08 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $58,058 $88,200 Not Implemented
UD0874 # 06 Y:2013 06 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $95,537 $39,093 Not Implemented
UD0874 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,338 $6,405 Not Implemented
UD0874 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,148 $51,240 Not Implemented
UD0874 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,108 $38,600 Not Implemented
UD0874 # 02 Y:2013 02 2013 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $16,400 $200 Implemented
UD0874 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $23,112 $20,000 Not Implemented
UD0595 # 04 Y:2000 04 2000 REDUCE SCRAP PRODUCTION $11,016 $20,400 Not Implemented