IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,340

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0268 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $44,247 $9,812 Implemented
LL0268 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,179 $317 Implemented
CO0593 # 02 Y:2006 02 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,180 $60 Implemented
CO0593 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,750 $120 Implemented
CO0593 # 07 Y:2006 07 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,550 $6,000 Implemented
AM0511 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $18,600 $59,000 Implemented
AM0511 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $150 Implemented
WI0506 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,973 $16,740 Implemented
WI0506 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,049 $0 Implemented
WI0506 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,464 $1,000 Implemented
WI0506 # 05 Y:2006 05 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $800 Implemented
WI0506 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $0 Implemented
WI0506 # 07 Y:2006 07 2006 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $990 $1,500 Implemented
GT0811 # 01 Y:2005 01 2005 IMPROVE LUBRICATION PRACTICES $3,405 $0 Implemented
GT0811 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,824 $20,700 Implemented
GT0811 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,135 $3,000 Implemented
GT0811 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,312 $750 Implemented
GT0811 # 06 Y:2005 06 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,877 $1,300 Implemented
MS0285 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,503 $138 Implemented
MS0285 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,062 $151 Implemented
UF0367 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $124 $0 Implemented
UF0367 # 03 Y:2005 03 2005 ELIMINATE A BY-PRODUCT $4,483 $870 Implemented
UF0367 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,578 $0 Implemented
UF0367 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,614 $3,948 Implemented
UF0367 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,974 $700 Implemented