IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0175 # 08 Y:1996 08 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $191,332 $265,000 Implemented
UL0175 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $104 $1,770 Implemented
UL0175 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,326 $130 Implemented
IA0162 # 06 Y:1996 06 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $450 $750 Implemented
IA0162 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $627 $693 Implemented
IA0162 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $73 $94 Implemented
IA0162 # 01 Y:1996 01 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,085 $1,030 Implemented
ME0205 # 13 Y:1996 13 1996 MINIMIZE WATER USAGE $1,236 $75 Implemented
ME0205 # 10 Y:1996 10 1996 MINIMIZE WATER USAGE $2,844 $2,302 Implemented
ME0205 # 09 Y:1996 09 1996 REPAIR AND ELIMINATE STEAM LEAKS $11,040 $200 Implemented
ME0205 # 08 Y:1996 08 1996 INSULATE BARE EQUIPMENT $196 $270 Implemented
ME0205 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $244 $38 Implemented
ME0205 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $285 $200 Implemented
ME0205 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,183 $7,572 Implemented
ME0205 # 01 Y:1996 01 1996 $115,428 $0 Implemented
UD0505 # 03 Y:1996 03 1996 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $8,648 $4,000 Implemented
UD0505 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,221 $500 Implemented
UD0505 # 06 Y:1996 06 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,448 $1,000 Implemented
UD0505 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $4,110 $6,000 Implemented
UD0505 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $12,351 $9,000 Implemented
UD0505 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,214 $0 Implemented
UD0505 # 07 Y:1996 07 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,640 $0 Implemented
DS0072 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,927 $675 Implemented
DS0072 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $5,755 $3,000 Implemented
DS0072 # 03 Y:1996 03 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,689 $1,110 Implemented