IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0205 # 05 Y:1996 05 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,306 $595 Not Implemented
ME0205 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $1,004 $2,112 Not Implemented
ME0205 # 03 Y:1996 03 1996 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,380 $453 Not Implemented
ME0205 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,183 $7,572 Implemented
ME0205 # 01 Y:1996 01 1996 $115,428 $0 Implemented
UD0505 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $12,351 $9,000 Implemented
UD0505 # 03 Y:1996 03 1996 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $8,648 $4,000 Implemented
UD0505 # 06 Y:1996 06 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,448 $1,000 Implemented
UD0505 # 07 Y:1996 07 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,640 $0 Implemented
UD0505 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $4,110 $6,000 Implemented
UD0505 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,214 $0 Implemented
UD0505 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,221 $500 Implemented
DS0072 # 03 Y:1996 03 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,689 $1,110 Implemented
DS0072 # 04 Y:1996 04 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,139 $10,000 Not Implemented
DS0072 # 06 Y:1996 06 1996 MINIMIZE WATER USAGE $5,755 $3,000 Implemented
DS0072 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,927 $675 Implemented
DS0072 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,015 $67,277 Not Implemented
DS0072 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $3,328 $3,572 Not Implemented
ME0192 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,640 $2,300 Not Implemented
ME0192 # 04 Y:1996 04 1996 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,860 $3,140 Not Implemented
ME0192 # 06 Y:1996 06 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $1,013 $846 Not Implemented
ME0192 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $566 $600 Not Implemented
ME0192 # 01 Y:1996 01 1996 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,700 $4,950 Not Implemented
ME0192 # 08 Y:1996 08 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $461 $0 Not Implemented
ME0192 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $5,300 $550 Not Implemented