Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0207 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,822 | $290 | Not Implemented |
IC0207 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,736 | $7,996 | Not Implemented |
IP0107 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,610 | $7,858 | Implemented |
IP0107 # 08 Y:2018 | 08 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $582 | $2,219 | Implemented |
IP0107 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,878 | $39,406 | Implemented |
IP0107 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,646 | $9,560 | Implemented |
IP0107 # 04 Y:2018 | 04 | 2018 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $957 | $2,201 | Implemented |
IP0107 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $629 | $1,485 | Not Implemented |
IP0107 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,840 | $3,587 | Implemented |
IP0107 # 01 Y:2018 | 01 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,310 | $596 | Implemented |
IP0107 # 09 Y:2018 | 09 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,691 | $85,000 | Implemented |
TR0008 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $534 | $2,128 | Implemented |
TR0008 # 04 Y:2018 | 04 | 2018 | MAINTAIN MACHINES TO REDUCE LEAKS | $13,889 | $1,000 | Implemented |
TR0008 # 03 Y:2018 | 03 | 2018 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $28,264 | $975 | Implemented |
TR0008 # 02 Y:2018 | 02 | 2018 | INSULATE BARE EQUIPMENT | $692 | $602 | Not Implemented |
TR0008 # 01 Y:2018 | 01 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,536 | $3,860 | Implemented |
TR0008 # 06 Y:2018 | 06 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,464 | $0 | Not Implemented |
AS0454 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $4,026 | $3,043 | Not Implemented |
AS0454 # 05 Y:2018 | 05 | 2018 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $11,530 | $150 | Not Implemented |
AS0454 # 04 Y:2018 | 04 | 2018 | USE LESS WASTEFUL PACKAGING | $12,596 | $196 | Not Implemented |
AS0454 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,697 | $12,185 | Not Implemented |
AS0454 # 02 Y:2018 | 02 | 2018 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $64,677 | $0 | Not Implemented |
AS0454 # 01 Y:2018 | 01 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $274,952 | $196,499 | Not Implemented |
NL0020 # 03 Y:2018 | 03 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $543 | $2,476 | Not Implemented |
NL0020 # 02 Y:2018 | 02 | 2018 | AIR CONDITION ONLY SPACE NECESSARY | $1,869 | $56 | Implemented |