IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,008

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0107 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $629 $1,485 Not Implemented
IP0107 # 04 Y:2018 04 2018 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $957 $2,201 Implemented
IP0107 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,646 $9,560 Implemented
IP0107 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,610 $7,858 Implemented
IP0107 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,878 $39,406 Implemented
IP0107 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $582 $2,219 Implemented
IP0107 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $18,691 $85,000 Implemented
TR0008 # 01 Y:2018 01 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,536 $3,860 Implemented
TR0008 # 02 Y:2018 02 2018 INSULATE BARE EQUIPMENT $692 $602 Not Implemented
TR0008 # 03 Y:2018 03 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $28,264 $975 Implemented
TR0008 # 04 Y:2018 04 2018 MAINTAIN MACHINES TO REDUCE LEAKS $13,889 $1,000 Implemented
TR0008 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $2,128 Implemented
TR0008 # 06 Y:2018 06 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,464 $0 Not Implemented
AS0454 # 01 Y:2018 01 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $274,952 $196,499 Not Implemented
AS0454 # 02 Y:2018 02 2018 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $64,677 $0 Not Implemented
AS0454 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,697 $12,185 Not Implemented
AS0454 # 04 Y:2018 04 2018 USE LESS WASTEFUL PACKAGING $12,596 $196 Not Implemented
AS0454 # 05 Y:2018 05 2018 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $11,530 $150 Not Implemented
AS0454 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $4,026 $3,043 Not Implemented
NL0020 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,414 $29,401 Implemented
NL0020 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $1,869 $56 Implemented
NL0020 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $543 $2,476 Not Implemented
NL0020 # 04 Y:2018 04 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $81 $200 Implemented
AS0450 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $35,156 $4,000 Not Implemented
AS0450 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,239 $400 Not Implemented