Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

277

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0051 # 06 Y:2003 06 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $145,000 $38,029 Implemented
LM0051 # 07 Y:2003 07 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $163,200 $19,584 Not Implemented
SF0204 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $412 $0 n/a
SF0204 # 02 Y:2000 02 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $793 $1,300 n/a
SF0204 # 03 Y:2000 03 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,179 $2,230 n/a
SF0204 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,335 $3,274 n/a
SF0204 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $891 $1,920 n/a
SF0204 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,518 $13,006 n/a
SF0204 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $714 $3,660 n/a
SF0204 # 08 Y:2000 08 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $615 $46 n/a
SF0184 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,959 $0 Not Implemented
SF0184 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $2,262 $840 Not Implemented
SF0184 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,576 $5,200 Not Implemented
SF0184 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $1,075 $956 Not Implemented
SF0184 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,881 $2,455 Not Implemented
SF0184 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,009 $10,260 Not Implemented
SF0184 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,128 $6,420 Not Implemented
SF0184 # 08 Y:2000 08 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,696 $850 Not Implemented
SF0184 # 09 Y:2000 09 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $63,815 $35,960 Not Implemented
SF0184 # 10 Y:2000 10 2000 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $43,395 $130,000 Not Implemented
SD0222 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,813 $4,697 Implemented
SD0222 # 02 Y:1999 02 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,888 $2,790 Not Implemented
SD0222 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,584 $6,000 Not Implemented
SD0222 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,823 $19,600 Not Implemented
SD0222 # 05 Y:1999 05 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $7,799 $11,000 Not Implemented