IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0132 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,306 $8,640 Not Implemented
WM0132 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,382 $12,660 Not Implemented
WM0132 # 04 Y:2019 04 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $992 $1,240 Not Implemented
WM0132 # 05 Y:2019 05 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $743 $1,010 Implemented
WM0132 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $650 $168 Not Implemented
WM0132 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $561 $0 Implemented
WM0132 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $245 $300 Implemented
WM0132 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $4,120 Implemented
WM0132 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $21,662 $106,000 Not Implemented
WM0126 # 03 Y:2018 03 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $14,198 $48,500 Not Implemented
WM0126 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $95,648 $66,000 Not Implemented
WM0126 # 02 Y:2018 02 2018 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $26,985 $20,000 Not Implemented
WM0126 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,011 $15,236 Implemented
WM0126 # 07 Y:2018 07 2018 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,029 $1,710 Not Implemented
WM0126 # 06 Y:2018 06 2018 REPAIR OR REPLACE STEAM TRAPS $7,154 $6,480 Implemented
WM0126 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,475 $8,650 Not Implemented
WM0126 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,864 $0 Not Implemented
WM0126 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,101 $2,850 Not Implemented
WI0506 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,049 $0 Implemented
WI0506 # 07 Y:2006 07 2006 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $990 $1,500 Implemented
WI0506 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,973 $16,740 Implemented
WI0506 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,464 $1,000 Implemented
WI0506 # 05 Y:2006 05 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $800 Implemented
WI0506 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,464 $0 Not Implemented
WI0506 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $0 Implemented