IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0014 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $403 $1,768 Not Implemented
IA0014 # 02 Y:1991 02 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $787 $100 Not Implemented
IA0014 # 01 Y:1991 01 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,760 $1,000 Not Implemented
IA0014 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $554 $0 Not Implemented
IA0014 # 04 Y:1991 04 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,788 $6,475 Not Implemented
IA0014 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,361 $600 Not Implemented
ND0011 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,123 $9,103 Implemented
OR0132 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $878 $5,922 Implemented
OR0132 # 06 Y:1991 06 1991 HEAT WATER WITH EXHAUST HEAT $6,513 $5,744 Implemented
OR0132 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,538 $1,000 Implemented
OR0132 # 04 Y:1991 04 1991 RECOVER AND REUSE COOLING WATER $2,804 $1,727 Implemented
OR0132 # 03 Y:1991 03 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,074 $500 Implemented
OR0132 # 02 Y:1991 02 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $317 $0 Not Implemented
OR0132 # 01 Y:1991 01 1991 INSTALL SET-BACK TIMERS $736 $0 Implemented
OR0132 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,450 $10,200 Implemented
ND0011 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,996 $0 Implemented
ND0011 # 08 Y:1991 08 1991 REPAIR OR REPLACE STEAM TRAPS $146 $250 Implemented
ND0011 # 03 Y:1991 03 1991 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $14,515 $0 Not Implemented
OR0135 # 01 Y:1991 01 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $322 $0 Implemented
ND0011 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $41,503 $2,000 Implemented
OR0132 # 08 Y:1991 08 1991 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,040 $1,200 Implemented
ND0011 # 05 Y:1991 05 1991 TREAT AND REUSE RINSE WATERS $9,694 $0 Not Implemented
ND0011 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $3,544 $700 Implemented
WI0131 # 12 Y:1991 12 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $353 $0 Not Implemented
OR0132 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $632 $898 Implemented