IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0285 # 09 Y:2001 09 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $20,950 $11,700 Implemented
UF0285 # 03 Y:2001 03 2001 INSTALL SKYLIGHTS $2,866 $3,569 Not Implemented
UF0285 # 08 Y:2001 08 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $4,760 $2,000 Implemented
UF0285 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,067 $1,072 Not Implemented
UF0285 # 05 Y:2001 05 2001 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $7,697 $25,000 Not Implemented
UF0285 # 07 Y:2001 07 2001 PAY BILLS ON TIME TO AVOID LATE FEES $288 $0 Implemented
UF0285 # 06 Y:2001 06 2001 METER WASTE WATER $778 $1,500 Implemented
UF0285 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $669 $101 Implemented
UF0285 # 01 Y:2001 01 2001 DEVELOP A REPAIR/REPLACE POLICY $1,737 $624 Not Implemented
NC0223 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,524 $40,000 Not Implemented
NC0223 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $186 $500 Implemented
NC0223 # 04 Y:2001 04 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,729 $10,000 Not Implemented
NC0223 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $2,592 Not Implemented
NC0223 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $160 $50 Implemented
NC0223 # 01 Y:2001 01 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $1,140 $1,800 Implemented
BD0191 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,689 $750 Implemented
BD0191 # 12 Y:2001 12 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $10,000 $250 Not Implemented
BD0191 # 13 Y:2001 13 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,250 $400 Implemented
BD0191 # 02 Y:2001 02 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,215 $4,660 Implemented
BD0191 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,185 $400 Not Implemented
BD0191 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $559 $0 Implemented
BD0191 # 09 Y:2001 09 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $182 $405 Implemented
BD0191 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $599 $1,050 Not Implemented
BD0191 # 08 Y:2001 08 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $524 $800 Implemented
BD0191 # 04 Y:2001 04 2001 DISCONNECT BALLASTS $1,021 $1,040 Not Implemented