Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0285 # 09 Y:2001 | 09 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $20,950 | $11,700 | Implemented |
UF0285 # 03 Y:2001 | 03 | 2001 | INSTALL SKYLIGHTS | $2,866 | $3,569 | Not Implemented |
UF0285 # 08 Y:2001 | 08 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $4,760 | $2,000 | Implemented |
UF0285 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,067 | $1,072 | Not Implemented |
UF0285 # 05 Y:2001 | 05 | 2001 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $7,697 | $25,000 | Not Implemented |
UF0285 # 07 Y:2001 | 07 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $288 | $0 | Implemented |
UF0285 # 06 Y:2001 | 06 | 2001 | METER WASTE WATER | $778 | $1,500 | Implemented |
UF0285 # 04 Y:2001 | 04 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $669 | $101 | Implemented |
UF0285 # 01 Y:2001 | 01 | 2001 | DEVELOP A REPAIR/REPLACE POLICY | $1,737 | $624 | Not Implemented |
NC0223 # 06 Y:2001 | 06 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,524 | $40,000 | Not Implemented |
NC0223 # 05 Y:2001 | 05 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $186 | $500 | Implemented |
NC0223 # 04 Y:2001 | 04 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,729 | $10,000 | Not Implemented |
NC0223 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $490 | $2,592 | Not Implemented |
NC0223 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $160 | $50 | Implemented |
NC0223 # 01 Y:2001 | 01 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $1,140 | $1,800 | Implemented |
BD0191 # 10 Y:2001 | 10 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $5,689 | $750 | Implemented |
BD0191 # 12 Y:2001 | 12 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $10,000 | $250 | Not Implemented |
BD0191 # 13 Y:2001 | 13 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,250 | $400 | Implemented |
BD0191 # 02 Y:2001 | 02 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,215 | $4,660 | Implemented |
BD0191 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,185 | $400 | Not Implemented |
BD0191 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $559 | $0 | Implemented |
BD0191 # 09 Y:2001 | 09 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $182 | $405 | Implemented |
BD0191 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $599 | $1,050 | Not Implemented |
BD0191 # 08 Y:2001 | 08 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $524 | $800 | Implemented |
BD0191 # 04 Y:2001 | 04 | 2001 | DISCONNECT BALLASTS | $1,021 | $1,040 | Not Implemented |