IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0661 # 04 Y:2015 04 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,575 $3,600 Not Implemented
OR0661 # 01 Y:2015 01 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $52,251 $18,807 Implemented
OR0661 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,783 $2,340 Not Implemented
OR0661 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $1,989 $170 Implemented
OR0661 # 02 Y:2015 02 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $76,637 $205,256 Not Implemented
OR0660 # 04 Y:2015 04 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $8,242 $54,525 Not Implemented
OR0660 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,283 $1,500 Implemented
OR0660 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $3,310 $8,500 Implemented
OR0660 # 01 Y:2015 01 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $135,000 $250,000 Implemented
OK0926 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,061 $100,000 Not Implemented
OK0926 # 03 Y:2015 03 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,134 $0 Not Implemented
OK0926 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,480 $22,750 Implemented
OK0926 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,746 $28,000 Not Implemented
OR0654 # 01 Y:2015 01 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,067,158 $300,000 Implemented
OR0654 # 02 Y:2015 02 2015 MODIFY WORKLOAD $23,248 $10,000 Implemented
OR0654 # 03 Y:2015 03 2015 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $115,650 $50,000 Implemented
OR0654 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,588 $5,986 Implemented
OR0654 # 05 Y:2015 05 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,722 $60,000 Not Implemented
OR0654 # 06 Y:2015 06 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $2,026 $9,325 Implemented
CO0709 # 08 Y:2015 08 2015 USE SOLAR HEAT TO HEAT MAKE-UP AIR $1,160 $8,080 Not Implemented
CO0709 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,310 $1,000 Implemented
CO0709 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,300 $10,780 Implemented
CO0709 # 05 Y:2015 05 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $260 $590 Not Implemented
CO0709 # 04 Y:2015 04 2015 AVOID FROST FORMATION ON EVAPORATORS $380 $1,960 Not Implemented
CO0709 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $840 $1,110 Not Implemented