IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 2091 Canned And Cured Fish And Seafoods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2319 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $307 $230 Implemented
GT0899 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $8,883 $9,708 Implemented
GT0899 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,097 $4,967 Implemented
GT0899 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,187 $1,000 Implemented
DL0063 # 02 Y:2010 02 2010 REDUCE VENTILATION AIR $34,080 $500 Implemented
DL0063 # 18 Y:2010 18 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $733 $615 Implemented
DL0063 # 15 Y:2010 15 2010 CLOSE OFF UNNEEDED STEAM LINES $3,627 $400 Implemented
DL0063 # 12 Y:2010 12 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $11,600 $1,585 Implemented
DL0063 # 10 Y:2010 10 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $16,180 $1,000 Implemented
DL0063 # 09 Y:2010 09 2010 REDUCE EXCESS STEAM BLEEDING $14,034 $419 Implemented
DL0063 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,000 $3,000 Implemented
DL0063 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,900 $166,850 Implemented
DL0063 # 03 Y:2010 03 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $31,600 $1,610 Implemented
DL0063 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $35,600 $100 Implemented
DL0063 # 11 Y:2010 11 2010 INSTALL OCCUPANCY SENSORS $12,978 $1,012 Implemented
MI0184 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,350 $920 Implemented
MI0184 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $60,788 $640 Implemented
MI0184 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,867 $1,500 Implemented
MI0184 # 03 Y:2009 03 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,578 $320 Implemented
SF0347 # 01 Y:2007 01 2007 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $675 $819 Implemented
SF0347 # 03 Y:2007 03 2007 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $7,280 $14,834 Implemented
ME0290 # 03 Y:2000 03 2000 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,732 $1,800 Implemented
ME0290 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,000 Implemented
ME0290 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,685 $2,475 Implemented
ME0290 # 08 Y:2000 08 2000 MOVE PRODUCT USING MECHANICAL MEANS $26,063 $13,600 Implemented