IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

220

matching recommendations
Reset
SIC 2092 Fresh Or Frozen Prepared Fish
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0090 # 07 Y:1994 07 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,278 $4,190 Implemented
MA0265 # 01 Y:1993 01 1993 COVER OPEN TANKS $7,538 $5,000 Implemented
MA0265 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,525 $12,420 Implemented
WI0169 # 02 Y:1993 02 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,593 $2,100 Implemented
WI0169 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $896 $1,454 Implemented
WI0169 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $570 $1,600 Implemented
OR0132 # 01 Y:1991 01 1991 INSTALL SET-BACK TIMERS $736 $0 Implemented
OR0132 # 03 Y:1991 03 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,074 $500 Implemented
OR0132 # 04 Y:1991 04 1991 RECOVER AND REUSE COOLING WATER $2,804 $1,727 Implemented
OR0132 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,538 $1,000 Implemented
OR0132 # 06 Y:1991 06 1991 HEAT WATER WITH EXHAUST HEAT $6,513 $5,744 Implemented
OR0132 # 07 Y:1991 07 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $878 $5,922 Implemented
OR0132 # 08 Y:1991 08 1991 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,040 $1,200 Implemented
OR0132 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $632 $898 Implemented
OR0132 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,450 $10,200 Implemented
OR0135 # 01 Y:1991 01 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $322 $0 Implemented
OR0135 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $175 $0 Implemented
OR0135 # 03 Y:1991 03 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,629 $0 Implemented
OR0135 # 04 Y:1991 04 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $317 $850 Implemented
OR0135 # 05 Y:1991 05 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $159 $482 Implemented
OR0135 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $124 $0 Implemented
OR0034 # 01 Y:1988 01 1988 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $975 $44 Implemented
OR0034 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $1,802 $1,200 Implemented
OR0034 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $227 $300 Implemented
OR0034 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52 $137 Implemented