IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

487

matching recommendations
Reset
SIC 2092 Fresh Or Frozen Prepared Fish
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0253 # 05 Y:1998 05 1998 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $1,600 $3,600 Not Implemented
ME0253 # 06 Y:1998 06 1998 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,571 $5,022 Implemented
ME0253 # 07 Y:1998 07 1998 PAY UTILITY BILLS ON TIME $1,227 $0 Implemented
ME0253 # 08 Y:1998 08 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $92,343 $1,105,000 Not Implemented
ME0253 # 09 Y:1998 09 1998 RECOVER AND REUSE COOLING WATER $1,436 $1,150 Not Implemented
MS0106 # 01 Y:1998 01 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,778 $4,246 Implemented
MS0106 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,362 $13,737 Not Implemented
MS0106 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,667 $22,209 Not Implemented
MS0106 # 04 Y:1998 04 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $723 $0 Implemented
MS0106 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,588 $1,920 Implemented
AM0281 # 01 Y:1996 01 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $95,600 $1,500 Implemented
AM0281 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $14,320 $14,320 Not Implemented
AM0281 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $150 $180 Not Implemented
AM0281 # 04 Y:1996 04 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,250 $2,370 Implemented
AM0281 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $950 $470 Implemented
AM0281 # 06 Y:1996 06 1996 PAY UTILITY BILLS ON TIME $903 $0 Implemented
AM0281 # 07 Y:1996 07 1996 COMBINE UTILITY METERS $245 $0 Implemented
KG0061 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $55,998 $50 Implemented
KG0061 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,385 $26,920 Implemented
KG0061 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $3,547 $450 Implemented
KG0061 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $988 $3,270 Not Implemented
KG0061 # 05 Y:1996 05 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,622 $270 Implemented
KG0061 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,004 $40 Implemented
KG0061 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,124 $520 Not Implemented
KG0061 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,057 $3,503 Implemented