IAC logo
IAC Assessment: AM0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product Shrimp & Catfish
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 32,600
Annual Production 4,300,000 Pounds
Production Hrs. Annual 2,280
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,064 1,570,047 kWh $0.06
Electricity Demand $21,769 7,063 kW-months/year $3.08
Electricity Fees $3,519 - $ -
TOTAL ENERGY COSTS $194,552
RECOMMENDED SAVINGS* $114,418 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,948
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ $ $ lb $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$95,600
Cost:
$1,500
- - - - - - $80,200 764,000 $15,400 - -
-
kWh
-
-
kW-months/year
-
-
$
$80,200
764,000
lb
$15,400
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,320
Cost:
$14,320
- - $14,320 7,030 - - - - - - -
-
kWh
$14,320
7,030
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$150
Cost:
$180
$70 1,465 $80 13 - - - - - - $70
1,465
kWh
$80
13
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$2,250
Cost:
$2,370
- - $2,250 360 - - - - - - -
-
kWh
$2,250
360
kW-months/year
-
-
$
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$950
Cost:
$470
$550 11,430 $400 65 - - - - - - $550
11,430
kWh
$400
65
kW-months/year
-
-
$
-
-
lb
-
-
$
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$903
Cost:
-
- - - - $903 - - - - - -
-
kWh
-
-
kW-months/year
$903
-
$
-
-
lb
-
-
$
07: 2.8112 COMBINE UTILITY METERS Savings:
$245
Cost:
-
- - - - $245 - - - - - -
-
kWh
-
-
kW-months/year
$245
-
$
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$114,418
Cost:
$18,840
$620 12,895 $17,050 7,468 $1,148 - $80,200 764,000 $15,400 - $620
12,895
kWh
$17,050
7,468
kW-months/year
$1,148
-
$
$80,200
764,000
lb
$15,400
-
$
TOTAL IMPLEMENTED Savings:
$99,948
Cost:
$4,340
$550 11,430 $2,650 425 $1,148 - $80,200 764,000 $15,400 - $550
11,430
kWh
$2,650
425
kW-months/year
$1,148
-
$
$80,200
764,000
lb
$15,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) By-product Production