IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2095 Roasted Coffee
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2402 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $5,000 $12,500 n/a
LS2402 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,573 $125 n/a
LS2402 # 01 Y:2024 01 2024 PAY BILLS ON TIME TO AVOID LATE FEES $35,595 $0 n/a
LS1903 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,445 $2,189 Not Implemented
LS1903 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $45 $0 Implemented
LS1903 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $480 $240 Not Implemented
LS1903 # 03 Y:2019 03 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $839 $0 Implemented
LS1903 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $135 $0 Implemented
LS1903 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,079 $150 Not Implemented
LS0012 # 04 Y:2017 04 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $21,748 $15,200 Not Implemented
LS0012 # 06 Y:2017 06 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,215 $80,000 Not Implemented
LS0012 # 05 Y:2017 05 2017 REDUCE EXCESSIVE BOILER BLOWDOWN $3,685 $4,250 Not Implemented
LS0012 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $993 $548 Not Implemented
LS0012 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,205 $920 Not Implemented
LS0012 # 01 Y:2017 01 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $28,766 $12,000 Not Implemented
LL0180 # 01 Y:2004 01 2004 INSTALL OCCUPANCY SENSORS $5,529 $100 Implemented
LL0180 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $140 Implemented
LL0180 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $374 $180 Implemented
LL0180 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $195 Implemented
LL0180 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,325 $7,520 Implemented
LL0180 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,933 $15 Not Implemented
LL0180 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,131 $2,120 Implemented
LL0180 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,329 $430 Implemented
LL0180 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $3,304 $2,261 Not Implemented