IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

461

matching recommendations
Reset
SIC 2096 Potato Chips And Similar Snacks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0184 # 08 Y:2000 08 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,696 $850 Not Implemented
SF0184 # 09 Y:2000 09 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $63,815 $35,960 Not Implemented
SF0184 # 10 Y:2000 10 2000 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $43,395 $130,000 Not Implemented
TN0650 # 01 Y:1999 01 1999 MODIFY CURRENT INCENTIVE PROGRAM $150,000 $30,000 Not Implemented
TN0650 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,400 $0 Implemented
TN0650 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,150 $0 Implemented
TN0650 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $6,220 $2,180 Not Implemented
TN0650 # 05 Y:1999 05 1999 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,350 $36,000 Not Implemented
TN0650 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,960 $16,600 Not Implemented
TN0650 # 07 Y:1999 07 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $39,640 $30,500 Not Implemented
TN0650 # 08 Y:1999 08 1999 USE MINIMUM STEAM OPERATING PRESSURE $5,280 $0 Not Implemented
TN0650 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,555 $1,120 Not Implemented
OR0338 # 01 Y:1999 01 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $14,000 $1,630 Implemented
OR0338 # 02 Y:1999 02 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $229,748 $79,349 Not Implemented
OR0338 # 03 Y:1999 03 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $6,574 $15,045 Not Implemented
OR0338 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $9,244 $1,831 Not Implemented
OR0338 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $11,400 $12,250 Not Implemented
OR0338 # 06 Y:1999 06 1999 USE OPTIMUM THICKNESS INSULATION $1,900 $1,810 Not Implemented
AM0304 # 01 Y:1997 01 1997 REDUCE SCRAP PRODUCTION $13,950 $3,000 Implemented
AM0304 # 02 Y:1997 02 1997 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $10,480 $12,500 Not Implemented
AM0304 # 03 Y:1997 03 1997 METER WASTE WATER $960 $3,500 Not Implemented
AM0304 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $975 Implemented
AM0304 # 05 Y:1997 05 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $750 $0 Implemented
AM0304 # 06 Y:1997 06 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $220 $30 Not Implemented
AM0304 # 07 Y:1997 07 1997 REPAIR AND ELIMINATE STEAM LEAKS $190 $65 Implemented