Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
472
matching recommendationsSIC | 2096 | Potato Chips And Similar Snacks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0398 # 04 Y:2011 | 04 | 2011 | AIR CONDITION ONLY SPACE NECESSARY | $4,965 | $424 | Implemented |
SF0398 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $112,927 | $56,209 | Implemented |
SF0398 # 06 Y:2011 | 06 | 2011 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $136,531 | $212,500 | Not Implemented |
SF0398 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $975 | $2,405 | Implemented |
SF0398 # 08 Y:2011 | 08 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,046 | $25,868 | Not Implemented |
SF0398 # 09 Y:2011 | 09 | 2011 | MINIMIZE WATER USAGE | $3,872 | $1,867 | Not Implemented |
MZ0061 # 11 Y:2010 | 11 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,994 | $5,000 | Implemented |
MZ0061 # 10 Y:2010 | 10 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $250,000 | $1,500,000 | Not Implemented |
MZ0061 # 09 Y:2010 | 09 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,880 | $0 | Not Implemented |
MZ0061 # 08 Y:2010 | 08 | 2010 | REDUCE SCRAP PRODUCTION | $92,766 | $100,000 | Implemented |
MZ0061 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $62,160 | $3,680 | Implemented |
MZ0061 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $20,184 | $0 | Implemented |
MZ0061 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,019 | $0 | Implemented |
MZ0061 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $607 | $150 | Not Implemented |
MZ0061 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $36,947 | $2,160 | Implemented |
MZ0061 # 02 Y:2010 | 02 | 2010 | USE OPTIMUM THICKNESS INSULATION | $79 | $1,200 | Implemented |
MZ0061 # 01 Y:2010 | 01 | 2010 | USE OPTIMUM THICKNESS INSULATION | $145 | $300 | Implemented |
AM0581 # 01 Y:2010 | 01 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,089 | $51,900 | Not Implemented |
AM0565 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,800 | $14,966 | Implemented |
AM0565 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,160 | $18 | Implemented |
AM0565 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,070 | $350 | Implemented |
AM0565 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $766 | $381 | Implemented |
AM0565 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $138 | $100 | Implemented |
AM0565 # 06 Y:2009 | 06 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $110 | $488 | Not Implemented |
GT0855 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,022 | $9,780 | Implemented |