Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
641
matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0576 # 04 Y:2022 | 04 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $21,495 | $6,314 | Implemented |
UF0576 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,479 | $16,283 | Implemented |
UF0576 # 02 Y:2022 | 02 | 2022 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $30,987 | $10,183 | Implemented |
UF0576 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,456 | $51,203 | Implemented |
MI0400 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,855 | $11,226 | Implemented |
MI0400 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $5,931 | $3,518 | Implemented |
MI0400 # 06 Y:2021 | 06 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,615 | $1,827 | Implemented |
OR0749 # 04 Y:2022 | 04 | 2022 | REPLACE BOILER | $122,100 | $1,640,000 | Implemented |
OR0749 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,003 | $11,329 | Implemented |
OR0749 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $999 | $0 | Implemented |
OR0744 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,065 | $18,105 | Implemented |
OR0744 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,963 | $2,340 | Implemented |
OR0744 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $15,238 | $36,792 | Implemented |
OR0744 # 01 Y:2021 | 01 | 2021 | MINIMIZE WATER USAGE | $2,348 | $0 | Implemented |
DL0187 # 10 Y:2021 | 10 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,153 | $1,574 | Implemented |
DL0187 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,940 | $5,000 | Implemented |
DL0187 # 02 Y:2021 | 02 | 2021 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $13,620 | $0 | Implemented |
DL0187 # 01 Y:2021 | 01 | 2021 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,390 | $0 | Implemented |
WV0602 # 10 Y:2020 | 10 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $136 | $570 | Implemented |
WV0602 # 09 Y:2020 | 09 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $154 | $568 | Implemented |
WV0602 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $263 | $1,060 | Implemented |
WV0602 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $268 | $1,225 | Implemented |
WV0602 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $1,512 | $2,197 | Implemented |
WV0602 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $1,669 | $2,886 | Implemented |
WV0602 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,049 | $3,000 | Implemented |