Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
641
matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0558 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,941 | $0 | Implemented |
SF0558 # 02 Y:2020 | 02 | 2020 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $98,999 | $34,416 | Implemented |
SF0558 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,252 | $4,542 | Implemented |
SF0558 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,759 | $2,995 | Implemented |
SF0558 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $282 | $379 | Implemented |
SF0558 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $145 | $591 | Implemented |
SF0555 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,084 | $0 | Implemented |
SF0555 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $1,257 | $1,080 | Implemented |
SF0555 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,734 | $3,930 | Implemented |
SF0555 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,221 | $33,106 | Implemented |
SF0555 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,764 | $20,616 | Implemented |
SF0555 # 07 Y:2020 | 07 | 2020 | REPLACE BOILER | $14,667 | $114,810 | Implemented |
MI0371 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $9,343 | $7,557 | Implemented |
MI0371 # 02 Y:2020 | 02 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,462 | $820 | Implemented |
MI0371 # 03 Y:2020 | 03 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,458 | $5,640 | Implemented |
MI0371 # 04 Y:2020 | 04 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,708 | $1,275 | Implemented |
MI0371 # 05 Y:2020 | 05 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,638 | $2,460 | Implemented |
MI0371 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $473 | $325 | Implemented |
MI0371 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $210 | $407 | Implemented |
MA0809 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,332 | $150 | Implemented |
MA0809 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,772 | $1,000 | Implemented |
MA0809 # 05 Y:2019 | 05 | 2019 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,114 | $4,500 | Implemented |
MA0809 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,036 | $3,057 | Implemented |
GT0930 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,041 | $3,500 | Implemented |
GT0930 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,081 | $2,100 | Implemented |