Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0644 # 03 Y:2002 | 03 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,441 | $1,738 | Implemented |
OK0644 # 02 Y:2002 | 02 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $570 | $3 | Implemented |
KU0505 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,350 | $20 | Implemented |
KU0505 # 09 Y:1998 | 09 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $25,940 | $2,560 | Implemented |
KU0505 # 08 Y:1998 | 08 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $75,000 | $193,000 | Implemented |
KU0505 # 06 Y:1998 | 06 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $800 | $0 | Implemented |
KU0505 # 05 Y:1998 | 05 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $510 | $260 | Implemented |
KU0505 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $720 | $340 | Implemented |
KU0505 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $970 | $400 | Implemented |
KU0505 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,140 | $9,600 | Implemented |
OK0528 # 01 Y:1997 | 01 | 1997 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $17,998 | $48,754 | Implemented |
OK0528 # 02 Y:1997 | 02 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,011 | $3,500 | Implemented |
OK0528 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $962 | $114 | Implemented |
OK0528 # 05 Y:1997 | 05 | 1997 | USE OPTIMUM THICKNESS INSULATION | $747 | $166 | Implemented |
KU0156 # 06 Y:1985 | 06 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,611 | $1,200 | Implemented |
KU0156 # 07 Y:1985 | 07 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,298 | $1,200 | Implemented |
KU0156 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,064 | $2,200 | Implemented |
KU0156 # 02 Y:1985 | 02 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,544 | $3,342 | Implemented |
KU0123 # 06 Y:1984 | 06 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $44 | $150 | Implemented |
KU0123 # 05 Y:1984 | 05 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $112 | $100 | Implemented |
KU0123 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14 | $20 | Implemented |
KU0123 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $522 | $100 | Implemented |
KU0048 # 01 Y:1982 | 01 | 1982 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $29,754 | $15,000 | Implemented |
KU0048 # 05 Y:1982 | 05 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,088 | $13,000 | Implemented |
KU0048 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,580 | $1,400 | Implemented |