IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,498

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1079 # 09 Y:2024 09 2024 INSTALL OCCUPANCY SENSORS $2,183 $830 n/a
LE0555 # 09 Y:2024 09 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $43,046 $90,000 n/a
LE0555 # 08 Y:2024 08 2024 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $101,613 $202,500 n/a
LE0555 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $306,071 $500,000 n/a
LE0555 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $4,850 $4,800 n/a
LE0555 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,514 $16,000 n/a
LE0555 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,403 $21,160 n/a
LE0555 # 03 Y:2024 03 2024 REPAIR OR REPLACE STEAM TRAPS $49,962 $35,200 n/a
LE0555 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $15,790 $7,920 n/a
LE0555 # 01 Y:2024 01 2024 INSTALL TIMERS AND/OR THERMOSTATS $40,483 $4,800 n/a
SJ0013 # 09 Y:2024 09 2024 COMBINE UTILITY METERS $454 $0 Not Implemented
SJ0013 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,399 $1,473 Not Implemented
SJ0013 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $22 Not Implemented
SJ0013 # 06 Y:2024 06 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,579 $0 Not Implemented
SJ0013 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $733 $0 Not Implemented
SJ0013 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,556 $4,600 Not Implemented
SJ0013 # 03 Y:2024 03 2024 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $28 $235 Not Implemented
SJ0013 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,372 $104 Not Implemented
SJ0013 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $47,814 $107,262 Not Implemented
KS2324 # 07 Y:2023 07 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $57,559 $312,824 n/a
KS2324 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $63,860 $598,739 n/a
KS2324 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,738 $5,480 n/a
KS2324 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,201 $0 n/a
KS2324 # 04 Y:2023 04 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $12,787 $8,320 n/a
KS2324 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,344 $22,467 n/a