IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

153

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0555 # 04 Y:2020 04 2020 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $450,171 $750,000 Not Implemented
SF0532 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $879 $0 Implemented
SF0532 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,844 $20,718 Implemented
SF0532 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $2,762 $4,681 Not Implemented
SF0532 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $1,777 $4,972 Not Implemented
SF0532 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $950 $2,757 Implemented
SF0532 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,025 $8,491 Implemented
SF0532 # 07 Y:2019 07 2019 REPLACE BOILER $20,414 $108,576 Implemented
SF0530 # 01 Y:2018 01 2018 INSTALL TIMERS AND/OR THERMOSTATS $6,177 $2,407 Implemented
SF0530 # 02 Y:2018 02 2018 UPGRADE CONTROLS ON COMPRESSORS $13,070 $22,633 Implemented
SF0530 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,808 $97,552 Implemented
SF0530 # 04 Y:2018 04 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,255 $11,220 Implemented
SF0530 # 05 Y:2018 05 2018 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,743 $4,357 Implemented
SF0530 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $209 $564 Implemented
SF0530 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,120 $58,070 Implemented
SF0530 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $97,224 $532,260 Not Implemented
SD0450 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,833 $1,900 Not Implemented
SD0450 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,795 $200 Not Implemented
SD0450 # 01 Y:2012 01 2012 USE MINIMUM STEAM OPERATING PRESSURE $8,111 $200 Not Implemented
SD0450 # 05 Y:2012 05 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,500 $25,000 Not Implemented
SD0450 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $1,297 $3,550 Not Implemented
SD0432 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,412 $800 Not Implemented
SD0432 # 02 Y:2011 02 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,059 $800 Implemented
SD0432 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $214 $100 Not Implemented
SD0432 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $204 $427 Implemented