IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0426 # 11 Y:2009 11 2009 INSTALL OCCUPANCY SENSORS $24,539 $0 Not Implemented
UF0426 # 12 Y:2009 12 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $37,500 $4,483 Not Implemented
UF0426 # 13 Y:2009 13 2009 INSTALL COMMON HEADER ON COMPRESSORS $229,898 $0 Not Implemented
UF0426 # 14 Y:2009 14 2009 DEVELOP A REPAIR/REPLACE POLICY $1,083 $0 Not Implemented
UF0426 # 15 Y:2009 15 2009 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $111,037 $4,000 Not Implemented
MI0155 # 01 Y:2007 01 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $66,401 $120,000 Not Implemented
MI0155 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $51,399 $22,558 Not Implemented
MI0155 # 03 Y:2007 03 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,061 $2,665 Not Implemented
MI0155 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,549 $23,640 Not Implemented
MI0155 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,901 $27,300 Not Implemented
MI0155 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,760 $1,074 Not Implemented
MI0155 # 07 Y:2007 07 2007 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $7,524 $7,800 Not Implemented
MI0155 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,179 $30 Not Implemented
MI0155 # 09 Y:2007 09 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,909 $180 Not Implemented
MI0155 # 10 Y:2007 10 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,610 $3,010 Not Implemented
MI0092 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $27,250 $720 Not Implemented
MI0092 # 02 Y:2004 02 2004 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $21,190 $50,000 Implemented
MI0092 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $405 $38,956 Not Implemented
MI0092 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $578 $0 Not Implemented
MI0092 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,474 $223 Not Implemented
MI0092 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,031 $1,350 Implemented
UF0285 # 01 Y:2001 01 2001 DEVELOP A REPAIR/REPLACE POLICY $1,737 $624 Not Implemented
UF0285 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,067 $1,072 Not Implemented
UF0285 # 03 Y:2001 03 2001 INSTALL SKYLIGHTS $2,866 $3,569 Not Implemented
UF0285 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $669 $101 Implemented